First Floor Suspended Concrete Slab Detail
Slab on ground floors in detail but contained only a limited outline of the alternatives available for suspended floors.
First floor suspended concrete slab detail. Concrete floor slab construction process includes erection of formwork placement of reinforcement pouring compacting and finishing concrete and lastly removal of formwork and curing of concrete slab. Renovations can often incorporate concrete slabs even when the original building does not. Prepare and place reinforcement for slab3. Both earlier publications are now superseded.
Assemble and erect formwork for slab2. The ground floor is made up of suspended concrete slab or beam and block floor supported by the external and internal load bearing walls which transfer the loads to the foundations below. Suspended floors are also used when the water table is high or when aggressive chemicals are present in the soil that may attack the concrete slab. Contents concrete floor slab construction process1.
This slab design can only work for a slab clear span of 14 feet which is only good for one car garage 2 cars if parked behind the other not side by side. Added rooms can use slab on ground or suspended slabs. Suspended slabs are made of concrete and steel mesh the same as a ground slab. Some slabs have hollow channels running through them these hollow core slabs are used to help reduce weight and also to allow cabling and piping to be run through the slab.
Before the concrete can be poured in situ to create the suspended first floor concrete slab formwork and shuttering must be erected as follow. They can be cast in situ reinforced concrete slabs precast concrete planks or slabs or the focus of this article beam and block floors. Beam and block floors systems. Suspended concrete floors can be constructed using different methods.
First floor slabs is a well established company specialising in all concrete work specifically suspended in situ cast concrete structures. To form this type of slab requires temporary beams columns and plywood as floor supports for the concrete. They are normally pre fabricated offsite and transported by truck. Utilizing a proven slab system our group slab partners can help with the construct of concrete flooring suspended flooring suspended concrete slabs casting concrete slabs construction and installing concrete slabs.
Established in 1999 first floor slabs has a broad portfolio with a multitude of successful projects since then. Installation of the first floor slab system is simple and cost effective. Comprehensive information on the latter was at that time provided in the association s companion publication guide to suspended concrete floors for houses t40 published in 1991. Detail 21 shows a suspended slab with no beam.
Pouring concrete slab on the first floor.